Specifications
Models
RAL110-04U19 and RAL300-04U21
Type
In-rack, liquid-to-liquid
Cooling capacity (RAL110)
80 kW at 8 deg C approach; 110 kW at 11.5 deg C approach
Cooling capacity (RAL300)
160 kW at 5 deg C approach; 300 kW at 9 deg C approach
Secondary (TCS) fluid temperature
10-55 deg C
Secondary flow rate (RAL110)
21.1 GPM at 20.8 psi (80 LPM at 1.44 bar)
Secondary flow rate (RAL300)
42.3 GPM at 24.6 psi (160 LPM at 1.7 bar)
Secondary fluid
Water, EGW or PGW
Environmental range
5-45 deg C
Form factor
19-inch rack mount, 4U
Deployment
In-rack liquid-to-liquid where facility water is available
Application class
Single-rack and small-cluster AI / HPC deployments
Overview
The Boyd RAL series puts a liquid-to-liquid coolant distribution unit inside the rack itself. The RAL110-04U19 covers 80 kW at an 8 deg C approach (110 kW at 11.5 deg C) and the RAL300-04U21 covers 160 kW at 5 deg C (300 kW at 9 deg C), both in a 19-inch 4U chassis that occupies rack space rather than floor space.
The secondary technology-cooling loop runs between 10 and 55 deg C and accepts water, EGW or PGW. RAL110 moves 21.1 GPM (80 LPM) at 20.8 psi; RAL300 doubles that to 42.3 GPM (160 LPM) at 24.6 psi. Because the unit mounts in-rack, it suits single-rack AI nodes and small clusters where running a full in-row plant is not justified, and where facility water is already available at the rack.
Key Benefits
80-300 kW of liquid-to-liquid capacity inside the rack removes the need for an in-row plant on smaller deployments. 4U form factor preserves rack-front space. 10-55 deg C secondary loop supports both chilled-water and warm-water operation. Water, EGW and PGW compatibility matches existing chemistry.
Applications
In-rack AI inference nodes, HPC clusters, lab and edge data centers with facility water, and phased liquid-cooling rollouts where only a few racks are converted at a time.
Request a Quote — BOYD RAL300 IN-RACK CDU — 160 KW TO 300 KW LIQUID-TO-LIQUID COOLING IN 4U
QS Compute — global B2B supply of AI computing hardware, edge AI systems and accelerators. Volume pricing, 15-day sample lead time.
Get Your Quote →